Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy
SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3/8” is a suitable thickness for long training dog leash, it has both strength and portability NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won't get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background. SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: check cord has a comfortable woven double layer handle, the joint of the rope is sewn by the machine and is very strong. SIZE: 3/8" (9.5 mm) in diam ,Size of this one is 30foot,color black, by 10 foot 15 foot, 30 foot and 50 foot three length for different training purpose
| Brand | Unbranded |
|---|---|
| Product ID | 487452972-1009314297 |
| EAN | 7429982796627 |
Please see the product safety information specific to this product outlined below
The following information is provided by the independent third-party retailer selling this product.
Product Safety Labels
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.
| £8.49 | STANDARD: | Estimated delivery date Fri 16 October 2026 ─ Wed 21 October 2026 |
Product is shipped from China.
Alternative shipping methods can be selected at checkout.
Products are shipped by the individual Fruugo retailers, who are located across Europe and the rest of the world. The delivery times and shipping prices vary depending on the retailer's location, the destination country and the selected delivery method.
Fruugo offers two delivery options: Standard Delivery or Express Delivery. All retailers offer a standard delivery service, and some retailers also offer an express delivery service.
- Standard Delivery – Domestic Standard delivery takes approximately 2-5 business days from dispatch, while an International Standard delivery takes 5-14 business days from dispatch. Normally track and trace and proof of delivery are not available on a standard service.
- Express Delivery – Domestic Express delivery takes approximately 1-2 business days from dispatch, while an International Express delivery takes 3-7 business days from dispatch. Usually track and trace and/or proof of delivery are available on an express service.
Although Fruugo retailers endeavour to deliver within these timescales, please note that the above timescales are estimated and not guaranteed.
The delivery timescales do not include any customs clearing times beyond Fruugo's control.
Please allow additional shipping time for deliveries to exceptional locations that are hard to reach, and also during busy periods such as Christmas.
All carriers deliver during normal business working hours and may require a signature on receipt, so please ensure your order is delivered to an address where someone will be available to accept it.
We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items.
Certain products purchased at Fruugo cannot be returned. They fall in the following categories:
- goods which are clearly personalised or made to your specifications
- goods which are liable to deteriorate rapidly, eg fresh fruit, fresh flowers
- sealed goods which are not suitable for return due to health protection or hygiene reasons, if opened, eg make up, underwear, pierced jewellery
- sealed audio or video recordings or computer software, if opened
- newspapers, periodicals and magazines
Please take reasonable care of the goods whilst in your care. Any goods returned must be in a resaleable condition. They must be unworn/unused with original tags attached and in original packaging. It is your responsibility to ensure that the goods are appropriately packaged to ensure they are not damaged in return transit.
Notifying us of a return
If you wish to return an order, or some of the products included in an order, please notify Fruugo customer care within 14 days of receiving the goods, including the following information:
- your name,
- order number,
- the item(s) you wish to return, and
- optionally a reason for your return: unsatisfied with item, item didn't match description, damaged item, wrong item, or some other reason.
Our customer care will send you specific instructions on how to ship the return package(s) to the retailer(s). Please do not ship the return package before you receive the instructions.
Shipping products back to retailers
Goods must be returned without undue delay and in any event not later than 14 days after notifying us of your cancellation.
If you are returning products to several retailers, you should distribute the products accordingly and send the products to those retailers who shipped them to you initially.
We strongly recommend that you use registered mail (and insure any high-value packages), since neither Fruugo nor the retailer take responsibility for shipments that are lost or damaged during return transportation.
Please ensure you retain a proof of postage receipt so in the unlikely event your parcel goes missing, you will have proof you sent it.
Refunds
You will be refunded within 14 days of the retailer receiving back the goods. We will notify you by e-mail once the products reach the retailer and are accepted for return. Where a retailer has offered to collect the goods, you will be refunded within 14 days of cancelling your contract.
Unless a product or products you wish to return arrived to you damaged or faulty, you are responsible for the return transportation costs.
Providing you are returning all the products from a specific retailer, we will refund the standard shipping costs you paid for the original delivery. If you chose to pay for a non-standard delivery, we will only refund the cost of our least expensive, standard delivery.
Damaged or faulty goods
If you receive a damaged, broken, or defective product, please notify Fruugo customer care as soon as possible. Include at least the following information:
- your name,
- order number,
- name of the damaged product(s), and
- state the nature of the damage with attached photograph
We will generally instruct you to ship the damaged product back to the retailer. As soon as it reaches the retailer, they will send you a replacement product. If the replacement can't be made, or if you wish to cancel the order, you will be refunded in full. You will also be reimbursed for reasonable returns postage costs for damaged or faulty goods once we have received your postage receipt.
If the outer packaging of your order is clearly damaged on arrival, and you are suspecting that the products are damaged as well, you can either reject the delivery or accept the goods and sign for them as damaged. In both instances, please notify Fruugo customer care as soon as possible.
Refusing delivery
If you refuse to accept delivery of all or part of your order (where the products or packaging do not appear to be damaged or defective) you will be responsible for the postage charges. Any fees and charges incurred by the retailer due to a package being refused will be deducted from your merchandise refund.
Please see the compliance information specific to this product outlined below.
The following information is provided by the independent third-party retailer selling this product.
Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.
- Shenzhen Haohe Cross Border Trade Co., Ltd.
- Shenzhen Haohe Cross Border Trade Co., Ltd.
- Shatou Subdistrict, Futian District, Shenzhen, China
- Tairan 6th Road, Tian'an Community
- Room 13C2, 13th Floor, Tairan Cangseng Building
- Shenzhen
- China
- 518000
- [email protected]
- 1(705)9312905
- https://www.uk/haikoujiabushukejiyouxiangongsi/m-14903
Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.
- GLOBEREX SPAIN SOLUCIONES SLU
- GLOBEREX SPAIN SOLUCIONES SLU
- CALLE TORCAL
- 2,5 D
- Madrid
- Spain
- 28041
- [email protected]
- 34 621668802