Pet Collar Leash Harness Set Adjustable Long Lead 63" Heavy Duty Training Set 3 Pack

RRP AED149.00
Price AED99.00
Save AED50.00 (33%)
Quantity
AED99.00 In Stock Dispatched within 3 days
+ AED29.49 STANDARD:
Sold by: Shenzhen Aiku Network Technology

Feature Highlights: 1. Complete 3-Piece Set – Includes an adjustable harness, a 63‑inch leash, and an adjustable collar. Everything you need for safe and convenient walks, runs, training, or playtime. 2. Durable & Heavy‑Duty – Made with strong nylon braiding and reinforced metal hardware, this set is built to last through years of daily use, even for active dogs. 3. Comfort & Safety First – Ergonomic design prevents choking and pulling. The harness stays securely in place without slipping, keeping your dog comfortable and in control. 4. Easy to Use – No‑tangle, quick‑clip attachments and a soft, easy‑grip handle make walks simpler. Adjustable straps ensure a snug, custom fit. 5. High‑Visibility & Long Reach – The bright color keeps your dog visible, while the extra‑long 63‑inch leash gives plenty of freedom during outdoor activities. Product Details: This all‑in‑one set is designed for everyday adventures with your dog. The heavy‑duty nylon construction and premium zinc‑alloy clips provide reliable strength without sacrificing comfort. The non‑pull harness and collar distribute pressure evenly, protecting your dog’s neck and fur. Ideal for walking, running, training, or trips to the vet—everything stays secure, comfortable, and easy to manage. Specifications: - Set Includes: 1 adjustable harness, 1 leash (63″), 1 adjustable collar - Size M: Chest 21.5″–27.5″, Collar 16.5″–20.5″ - Recommended for dogs up to 77 lb (e.g., Cocker Spaniel, Labrador, Corgi) - Material: Braided nylon + chrome‑plated zinc alloy - Color Shown: Black Harness + Leash + Collar Tip: Leave a little extra strap length when adjusting the collar to help the buckle stay securely locked.

Brand Unbranded
Product ID 486358421-1007740723
EAN 6752343332709

Please see the product safety information specific to this product outlined below

The following information is provided by the independent third-party retailer selling this product.

Product Safety Labels
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

CE Mark
Safety Warnings: Do not let your children touch this product alone to avoid swallowing or other injuries.Adult supervision recommended
Ingredients: Mixed materials 100%
AED29.49 STANDARD: Estimated delivery date Thu 08 October 2026Fri 16 October 2026

Product is shipped from China.

Alternative shipping methods can be selected at checkout.

Products are shipped by the individual Fruugo retailers, who are located across Europe and the rest of the world. The delivery times and shipping prices vary depending on the retailer's location, the destination country and the selected delivery method.

Fruugo offers two delivery options: Standard Delivery or Express Delivery. All retailers offer a standard delivery service, and some retailers also offer an express delivery service.

  • Standard Delivery – Domestic Standard delivery takes approximately 2-5 business days from dispatch, while an International Standard delivery takes 5-14 business days from dispatch. Normally track and trace and proof of delivery are not available on a standard service.
  • Express Delivery – Domestic Express delivery takes approximately 1-2 business days from dispatch, while an International Express delivery takes 3-7 business days from dispatch. Usually track and trace and/or proof of delivery are available on an express service.

Although Fruugo retailers endeavour to deliver within these timescales, please note that the above timescales are estimated and not guaranteed.

The delivery timescales do not include any customs clearing times beyond Fruugo's control.

Please allow additional shipping time for deliveries to exceptional locations that are hard to reach, and also during busy periods such as Christmas.

All carriers deliver during normal business working hours and may require a signature on receipt, so please ensure your order is delivered to an address where someone will be available to accept it.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items.

Certain products purchased at Fruugo cannot be returned. They fall in the following categories:

  • goods which are clearly personalised or made to your specifications
  • goods which are liable to deteriorate rapidly, eg fresh fruit, fresh flowers
  • sealed goods which are not suitable for return due to health protection or hygiene reasons, if opened, eg make up, underwear, pierced jewellery
  • sealed audio or video recordings or computer software, if opened
  • newspapers, periodicals and magazines

Please take reasonable care of the goods whilst in your care. Any goods returned must be in a resaleable condition. They must be unworn/unused with original tags attached and in original packaging. It is your responsibility to ensure that the goods are appropriately packaged to ensure they are not damaged in return transit.

Notifying us of a return

If you wish to return an order, or some of the products included in an order, please notify Fruugo customer care within 14 days of receiving the goods, including the following information:

  • your name,
  • order number,
  • the item(s) you wish to return, and
  • optionally a reason for your return: unsatisfied with item, item didn't match description, damaged item, wrong item, or some other reason.

Our customer care will send you specific instructions on how to ship the return package(s) to the retailer(s). Please do not ship the return package before you receive the instructions.

Shipping products back to retailers

Goods must be returned without undue delay and in any event not later than 14 days after notifying us of your cancellation.

If you are returning products to several retailers, you should distribute the products accordingly and send the products to those retailers who shipped them to you initially.

We strongly recommend that you use registered mail (and insure any high-value packages), since neither Fruugo nor the retailer take responsibility for shipments that are lost or damaged during return transportation.

Please ensure you retain a proof of postage receipt so in the unlikely event your parcel goes missing, you will have proof you sent it.

Refunds

You will be refunded within 14 days of the retailer receiving back the goods. We will notify you by e-mail once the products reach the retailer and are accepted for return. Where a retailer has offered to collect the goods, you will be refunded within 14 days of cancelling your contract.

Unless a product or products you wish to return arrived to you damaged or faulty, you are responsible for the return transportation costs.

Providing you are returning all the products from a specific retailer, we will refund the standard shipping costs you paid for the original delivery. If you chose to pay for a non-standard delivery, we will only refund the cost of our least expensive, standard delivery.

Damaged or faulty goods

If you receive a damaged, broken, or defective product, please notify Fruugo customer care as soon as possible. Include at least the following information:

  • your name,
  • order number,
  • name of the damaged product(s), and
  • state the nature of the damage with attached photograph

We will generally instruct you to ship the damaged product back to the retailer. As soon as it reaches the retailer, they will send you a replacement product. If the replacement can't be made, or if you wish to cancel the order, you will be refunded in full. You will also be reimbursed for reasonable returns postage costs for damaged or faulty goods once we have received your postage receipt.

If the outer packaging of your order is clearly damaged on arrival, and you are suspecting that the products are damaged as well, you can either reject the delivery or accept the goods and sign for them as damaged. In both instances, please notify Fruugo customer care as soon as possible.

Refusing delivery

If you refuse to accept delivery of all or part of your order (where the products or packaging do not appear to be damaged or defective) you will be responsible for the postage charges. Any fees and charges incurred by the retailer due to a package being refused will be deducted from your merchandise refund.